What Your Stand Builder Needs from You

Author
Juliano Wahab
CEO, Monet
Line drawing of a stand frame, half built, with one open dimension line in red on its back wall.

This guide lists what a stand builder needs from you, so the quote holds and the build has no surprises. It covers the space, the drawings and the calendar of decisions. It ends with a 30 point handover checklist you can copy.

Here is a call nobody wants. It is two weeks before the show, and your stand builder rings. The counter in your drawings sits right where the hall has a column. Nobody sent the builder the hall plan until today. Now the counter must be cut again, and someone pays twice.

What a stand builder needs from you fits on one page. The space must be fixed. The drawings must be to scale. The decisions must sit on a calendar. Most build surprises come from facts that arrive late. Others come from drawings that do not match. Give the builder one approved set, drawn to scale, and a calendar of decisions. Do it before the workshop starts cutting. Then the quote holds.

Why does the work start on paper?

A stand is built on site, but the work starts on the drawings. Every cut in the workshop follows a sheet. So the sheet has to be right first.

The order matters too. If the client approves a picture the builder cannot build, the quote will not hold.

Late facts cost both sides. The builder quotes again, orders new material or rebuilds parts already cut. You pay for the same work twice. Sometimes you pay extra for night work during the build in the hall.

Fix the space before the quote

Before quoting, the builder needs the show name, the hall and the stand number. They need the stand size, the open sides and the height limit. They need any rule on how far back from the aisle the stand must sit. They need the hall plan with its columns, power and water points. It should show how much weight the floor takes. It should also show the rigging points, the places where things can hang from the roof. Last, they need the organizer's technical manual with its deadlines.

Deadlines differ by venue. So quote them exactly from the current edition. The Las Vegas Convention Center Facility Guide from July 2026 wants booth plans at least 30 days before move in. It wants rigging plans 14 days before. Messe München wants you to apply for a stand with two floors at least six weeks before setup. The form needs a checked structural calculation. That is the math that shows the stand will stay up.

The drawings a stand builder needs

The builder works from a set of drawings, not from a render. A render is a picture of the finished stand. The set needs these sheets.

  • A plan set out from a line on the hall grid or from the edge of an aisle. Then the stand lands where it was drawn.
  • Elevations, which are flat drawings of each side, with heights, materials and finishes.
  • Sections, which are drawings of a cut through the stand, for any raised floor.
  • A rigging plan for anything hung, with its weight.
  • Structural calculations for stands with two floors, where the organizer asks for them.
  • The power and AV layout.
  • Graphics templates at full size.

All of it comes from one approved version. A plan from Tuesday and elevations from Friday show two different stands. What makes a drawing production ready sets the standard each sheet should meet. A stand built from a kit also needs the parts list from the kit maker.

Should the render come first?

An early render helps a team agree on an idea before it is locked in. But a check that the stand can be built comes first for a reason. It stops a client falling for a stand nobody can build at the price.

Both orders work if the render comes from a model of the stand, drawn to scale in the hall. Then the picture the client approves and the drawings the builder prices show the same stand.

Put decisions and dates on a calendar

Large stands take longer than most exhibitors expect. A big custom stand can need months from the first talk to the day the show opens. The organizer's deadlines fall well before that.

Build the calendar backward from the opening day. Name who approves each step. The brief comes first, and how to brief an exhibition stand designer covers it.

Here is the calendar filled in for a made up custom stand.

StepWhenWho approves
Brief agreed26 weeks before openingHead of marketing
First design signed off20 weeks beforeHead of marketing
Design freeze, the date the design stops changing14 weeks beforeHead of marketing and the budget holder
Graphics files final8 weeks beforeBrand manager
Plans sent to the organizer, with hanging items and stands with two floors8 weeks before, ahead of the organizer's deadlineThe organizer
Workshop build starts6 weeks beforeThe builder's project manager
Move in3 days beforeThe builder's site lead
Show opensOpening dayYour project lead, after a walk round the stand
Take down and move outThe day the show closesThe builder's site lead

Set one rule for late changes. After the design freeze, every change goes to the builder in writing. It shows the cost and the effect on dates. Only the named approver can say yes.

Where Monet fits

Monet is built for the two failures in that phone call. They are late facts and drawings that do not match.

Upload the hall plan as a PDF or DWG file. Or start from the Monet library of venue plans, drawn to scale. Describe the stand in a prompt, and Monet designs it to scale in the hall. Renders and walkthrough videos show the stand in the real room. So the client signs off on what will be built.

Production ready plans and elevations come from the same layout. You can export DWG, DXF, PDF, JPG and GLB files.

When something changes, one edit updates the plan, the renders and the drawings. The layout checks run again too. They check the space in front of exits, things that block the main walkway, crowd flow and noise on nearby booths. Everyone works from one current version.

The builder still owns the shop drawings, the joinery details, the cut lists and the amounts of material. Monet does not add custom objects such as signs or props. Those stay in the builder's drawings.

The 30 point handover checklist

GroupNo.Item
Space and rules1Show, hall and stand number
Space and rules2Stand size and open sides
Space and rules3Height limit and how far back from the aisle to sit
Space and rules4Hall plan with columns and services
Space and rules5Floor load limits
Space and rules6Rigging points and their limits
Space and rules7Organizer's technical manual, current edition
Space and rules8Every organizer deadline in one list
Drawings and files9Plan set out from a grid line or aisle edge
Drawings and files10Elevations with heights, materials and finishes
Drawings and files11Sections for raised floors
Drawings and files12Rigging plan with weights
Drawings and files13Structural calculations where needed
Drawings and files14Power and AV layout
Drawings and files15Graphics templates at full size
Drawings and files16Final artwork files
Drawings and files17Approved renders that match the drawings
Drawings and files18Version number and date on every sheet
Decisions and dates19Named approver for design and budget
Decisions and dates20Date to sign off the first design
Decisions and dates21Design freeze date
Decisions and dates22Graphics deadline
Decisions and dates23Dates to send plans to the organizer
Decisions and dates24Rule for changes after the freeze
Decisions and dates25Payment stages
Getting it there26Move in and move out times
Getting it there27Freight and dock booking
Getting it there28Contacts and phone numbers on site
Getting it there29Storage and return orders after the show
Getting it there30Who orders power, internet, rigging and cleaning

One set, one calendar

Go back to that call two weeks before the show. If the hall plan had been in the first pack, the column would have shown up on day one. The counter would have moved on paper, not in the workshop. So send the builder one approved set, drawn to scale, with the calendar of decisions. Do it before the workshop starts cutting, and the quote holds.

Frequently asked questions

What drawings does an exhibition stand builder need?

Start with a plan set out from a hall grid line or an aisle edge. Add elevations with heights and finishes, and sections for raised floors. Add a rigging plan and, where asked, structural calculations for stands with two floors. Include the power and AV layout and graphics templates at full size, all from one approved version.

How far ahead should I brief a stand builder?

Count back from the organizer's deadlines, not from the opening day. Venues ask for booth and rigging plans weeks before move in. A large custom stand can take months from the first talk to the opening. So bring the builder in before the first design is signed off.

Can the builder work from the venue's PDF or DWG?

Yes, if it is to scale and up to date. Check two long sizes you know against the drawing before anyone sets out the stand. Then confirm the columns, services and hanging points with the venue's operations team before the drawings go out.

Who should approve changes after the design freeze?

One named person who controls the budget. Every change after the freeze should reach the builder in writing, with its cost and its effect on dates. Work starts only after that person says yes. Changes nobody writes down are where quotes stop holding.