What Your Stand Builder Needs from You

This guide lists what a stand builder needs from you, so the quote holds and the build has no surprises. It covers the space, the drawings and the calendar of decisions. It ends with a 30 point handover checklist you can copy.
Here is a call nobody wants. It is two weeks before the show, and your stand builder rings. The counter in your drawings sits right where the hall has a column. Nobody sent the builder the hall plan until today. Now the counter must be cut again, and someone pays twice.
What a stand builder needs from you fits on one page. The space must be fixed. The drawings must be to scale. The decisions must sit on a calendar. Most build surprises come from facts that arrive late. Others come from drawings that do not match. Give the builder one approved set, drawn to scale, and a calendar of decisions. Do it before the workshop starts cutting. Then the quote holds.
Why does the work start on paper?
A stand is built on site, but the work starts on the drawings. Every cut in the workshop follows a sheet. So the sheet has to be right first.
The order matters too. If the client approves a picture the builder cannot build, the quote will not hold.
Late facts cost both sides. The builder quotes again, orders new material or rebuilds parts already cut. You pay for the same work twice. Sometimes you pay extra for night work during the build in the hall.
Fix the space before the quote
Before quoting, the builder needs the show name, the hall and the stand number. They need the stand size, the open sides and the height limit. They need any rule on how far back from the aisle the stand must sit. They need the hall plan with its columns, power and water points. It should show how much weight the floor takes. It should also show the rigging points, the places where things can hang from the roof. Last, they need the organizer's technical manual with its deadlines.
Deadlines differ by venue. So quote them exactly from the current edition. The Las Vegas Convention Center Facility Guide from July 2026 wants booth plans at least 30 days before move in. It wants rigging plans 14 days before. Messe München wants you to apply for a stand with two floors at least six weeks before setup. The form needs a checked structural calculation. That is the math that shows the stand will stay up.
The drawings a stand builder needs
The builder works from a set of drawings, not from a render. A render is a picture of the finished stand. The set needs these sheets.
- A plan set out from a line on the hall grid or from the edge of an aisle. Then the stand lands where it was drawn.
- Elevations, which are flat drawings of each side, with heights, materials and finishes.
- Sections, which are drawings of a cut through the stand, for any raised floor.
- A rigging plan for anything hung, with its weight.
- Structural calculations for stands with two floors, where the organizer asks for them.
- The power and AV layout.
- Graphics templates at full size.
All of it comes from one approved version. A plan from Tuesday and elevations from Friday show two different stands. What makes a drawing production ready sets the standard each sheet should meet. A stand built from a kit also needs the parts list from the kit maker.
Should the render come first?
An early render helps a team agree on an idea before it is locked in. But a check that the stand can be built comes first for a reason. It stops a client falling for a stand nobody can build at the price.
Both orders work if the render comes from a model of the stand, drawn to scale in the hall. Then the picture the client approves and the drawings the builder prices show the same stand.
Put decisions and dates on a calendar
Large stands take longer than most exhibitors expect. A big custom stand can need months from the first talk to the day the show opens. The organizer's deadlines fall well before that.
Build the calendar backward from the opening day. Name who approves each step. The brief comes first, and how to brief an exhibition stand designer covers it.
Here is the calendar filled in for a made up custom stand.
| Step | When | Who approves |
|---|---|---|
| Brief agreed | 26 weeks before opening | Head of marketing |
| First design signed off | 20 weeks before | Head of marketing |
| Design freeze, the date the design stops changing | 14 weeks before | Head of marketing and the budget holder |
| Graphics files final | 8 weeks before | Brand manager |
| Plans sent to the organizer, with hanging items and stands with two floors | 8 weeks before, ahead of the organizer's deadline | The organizer |
| Workshop build starts | 6 weeks before | The builder's project manager |
| Move in | 3 days before | The builder's site lead |
| Show opens | Opening day | Your project lead, after a walk round the stand |
| Take down and move out | The day the show closes | The builder's site lead |
Set one rule for late changes. After the design freeze, every change goes to the builder in writing. It shows the cost and the effect on dates. Only the named approver can say yes.
Where Monet fits
Monet is built for the two failures in that phone call. They are late facts and drawings that do not match.
Upload the hall plan as a PDF or DWG file. Or start from the Monet library of venue plans, drawn to scale. Describe the stand in a prompt, and Monet designs it to scale in the hall. Renders and walkthrough videos show the stand in the real room. So the client signs off on what will be built.
Production ready plans and elevations come from the same layout. You can export DWG, DXF, PDF, JPG and GLB files.
When something changes, one edit updates the plan, the renders and the drawings. The layout checks run again too. They check the space in front of exits, things that block the main walkway, crowd flow and noise on nearby booths. Everyone works from one current version.
The builder still owns the shop drawings, the joinery details, the cut lists and the amounts of material. Monet does not add custom objects such as signs or props. Those stay in the builder's drawings.
The 30 point handover checklist
| Group | No. | Item |
|---|---|---|
| Space and rules | 1 | Show, hall and stand number |
| Space and rules | 2 | Stand size and open sides |
| Space and rules | 3 | Height limit and how far back from the aisle to sit |
| Space and rules | 4 | Hall plan with columns and services |
| Space and rules | 5 | Floor load limits |
| Space and rules | 6 | Rigging points and their limits |
| Space and rules | 7 | Organizer's technical manual, current edition |
| Space and rules | 8 | Every organizer deadline in one list |
| Drawings and files | 9 | Plan set out from a grid line or aisle edge |
| Drawings and files | 10 | Elevations with heights, materials and finishes |
| Drawings and files | 11 | Sections for raised floors |
| Drawings and files | 12 | Rigging plan with weights |
| Drawings and files | 13 | Structural calculations where needed |
| Drawings and files | 14 | Power and AV layout |
| Drawings and files | 15 | Graphics templates at full size |
| Drawings and files | 16 | Final artwork files |
| Drawings and files | 17 | Approved renders that match the drawings |
| Drawings and files | 18 | Version number and date on every sheet |
| Decisions and dates | 19 | Named approver for design and budget |
| Decisions and dates | 20 | Date to sign off the first design |
| Decisions and dates | 21 | Design freeze date |
| Decisions and dates | 22 | Graphics deadline |
| Decisions and dates | 23 | Dates to send plans to the organizer |
| Decisions and dates | 24 | Rule for changes after the freeze |
| Decisions and dates | 25 | Payment stages |
| Getting it there | 26 | Move in and move out times |
| Getting it there | 27 | Freight and dock booking |
| Getting it there | 28 | Contacts and phone numbers on site |
| Getting it there | 29 | Storage and return orders after the show |
| Getting it there | 30 | Who orders power, internet, rigging and cleaning |
One set, one calendar
Go back to that call two weeks before the show. If the hall plan had been in the first pack, the column would have shown up on day one. The counter would have moved on paper, not in the workshop. So send the builder one approved set, drawn to scale, with the calendar of decisions. Do it before the workshop starts cutting, and the quote holds.
Frequently asked questions
What drawings does an exhibition stand builder need?
Start with a plan set out from a hall grid line or an aisle edge. Add elevations with heights and finishes, and sections for raised floors. Add a rigging plan and, where asked, structural calculations for stands with two floors. Include the power and AV layout and graphics templates at full size, all from one approved version.
How far ahead should I brief a stand builder?
Count back from the organizer's deadlines, not from the opening day. Venues ask for booth and rigging plans weeks before move in. A large custom stand can take months from the first talk to the opening. So bring the builder in before the first design is signed off.
Can the builder work from the venue's PDF or DWG?
Yes, if it is to scale and up to date. Check two long sizes you know against the drawing before anyone sets out the stand. Then confirm the columns, services and hanging points with the venue's operations team before the drawings go out.
Who should approve changes after the design freeze?
One named person who controls the budget. Every change after the freeze should reach the builder in writing, with its cost and its effect on dates. Work starts only after that person says yes. Changes nobody writes down are where quotes stop holding.
Give your builder one current set, from the first quote to the last change. Monet designs your stand from a prompt, then makes the plans, elevations and renders from that one version. Get started for free on Monet.