How to Measure Planning Time Saved with AI

Wireframe timeline bars comparing planning time before and after AI, the stage that still needed people in red

This walkthrough shows you how to measure whether AI saves planning time. It uses a made up design studio and invented numbers. It sets a start and an end, builds a baseline from past timesheets and compares hours stage by stage. You get a template and a statement to measure your own projects honestly.

Your boss asks a simple question. Did the new AI tool save us time? You say yes, about half. She asks how you know. You have no answer.

Before you say you cut planning time with AI, you need three things. You need a fixed start and end. You need a real baseline, which is what the work took before. And you need projects that are alike. This walkthrough shows the method on one project. The studio, the project and every number below are made up to show the method. They are not a client result, and they predict nothing about yours.

A made up studio and project

The example studio has six people. Two are senior designers, three are designers and one is a project lead. The project is a two day product launch for 400 guests in a hotel ballroom. The brief asks for a stage, a demo area and a lounge. It also asks for a dinner layout for the second night.

The studio moved its layout and drawing work into Monet. It wants to know if that changed its hours, and at which stage.

How to measure planning time with AI

Planning time starts the day the brief arrives. It ends when the client approves the layout and the drawings go out. Count it twice. Count it in person hours, which add up each person's time. Count it in calendar days too. Person hours show cost. Calendar days show how long the client waits.

The baseline is the median of at least three past projects that are alike. Match them on venue size and scope, meaning what the work covers. A median is the middle value, so one odd project does not throw it off. Take every figure from timesheets, not from memory.

Copy this template.

ElementRule
StagesVenue plan preparation, layout options, client revisions, renders, drawings, checks
Timesheet extractProject, date, person, role, stage, hours, tool
BaselineMedian of at least three projects that are alike, matched on venue size and scope
SumBaseline hours minus after hours, divided by baseline hours, for person hours and for calendar days
StatementSample size, why each project was chosen, what was left out, who checked the figures

The baseline, in example numbers

In the example, the studio picks three past launches in ballrooms of a similar size. It leaves out a fourth, because that client changed venue halfway through. That choice goes in the statement.

Take the median of each stage on its own. Stage medians do not always add up to the median total. So report the total from the projects themselves.

The same kind of project in Monet

The team logs the new project the same way, stage by stage. In Monet the work has five steps.

  1. Upload the venue plan as a PDF or DWG.
  2. Make a layout to scale from the brief.
  3. Let the layout checks run again after each change. They check exit space, things blocking the main walkway and crowd flow. They check booth noise, a carbon estimate and how the space is used.
  4. Make 3D renders and walkthrough videos of the event in the room.
  5. Export production ready plans and elevations. One change updates the plan, renders and drawings together.

Write the tool on every timesheet line. Then each hour can be traced to a stage and a method. The drawing stage is shown step by step in a walkthrough of production drawings from an AI workflow.

Where the hours went, in the example

Every figure in this table is invented.

StageBaseline median hours (made up)After hours (made up)Change
Venue plan preparation633 fewer
Layout options1468 fewer
Client revisions12142 more
Renders1046 fewer
Drawings1697 fewer
Checks44No change
Total624022 fewer

In this example, client revisions took two hours longer. The team showed more options, so the client asked for more changes. A real log should show a stage like this, not hide it.

To get the share of time saved, divide the hours saved by the baseline hours. Do the same for calendar days. Publish both figures with the statement, or publish neither. Adapt this statement.

"Planning time was counted from brief received to client approved layout and issued drawings. The baseline is the median of [n] projects that are alike, from [years], chosen for [reasons]. [n] were left out because [reasons]. Figures come from timesheets and were checked by [role]."

What the hours will not show

Some work still needs people, whatever the tool. That includes the brief, the client talks and design judgment. It includes working with builders and the final check. Monet does not add custom objects such as signs or props. So that time stays in the log as before.

Fewer hours also change how a studio should price its work. Why to stop charging billable hours makes that case.

Run it on your next project

Go back to your boss and her question. Pick three past projects that are alike, and pull their timesheets. Log the next project the same way. Then you can say how many hours you saved, at which stage, and how you know. The method is what makes any time figure worth quoting.

Run the same before and after test on your next project. Upload your venue plan to Monet as a PDF or DWG. Then log each stage, from the first layout to the renders and the production ready drawings. Get started for free on Monet.