Monet Logo
™

How to Present an Event Design to a Client

Technical drawing of a meeting table with event design sheets in presentation order and a red approval seal

A good design can still stall in the meeting. This guide shows you how to present an event design so the client can say yes in one meeting. You get an order to reuse, a table of which view answers which question, words to use and words to avoid, and a list of decisions to copy.

You are ten minutes into the meeting. You show the plan, and the client nods. Then her boss walks in late. He has not read the brief. He looks at one render and asks for the stage on the long wall. Twenty minutes later, nobody has agreed to anything.

The design was good. The meeting was not. This guide shows you how to present an event design to a client and leave with a yes. Fix three things before you go in. Set the order. Pick the view that answers each question. Tie every choice to the brief.

Who decides, and who can say no?

Before the meeting, find out who decides. Then find out who can say no. The list may include the venue, a safety officer, a sponsor and a boss who has not read the brief. Each one brings one question. The design has to answer it.

Call the person who decides before the meeting. Ten minutes is enough. Do not email the design ahead with no notes. A PDF read cold gets comments on taste, with none of the reasons behind it. Mike Monteiro's book Design Is a Job (A Book Apart, 2012) treats presenting as part of the work. It is not a polite extra that comes after the work.

The client first checks that you understood the problem. Only then do they judge your answer. So say the brief back before you show a single view.

The order for every event design presentation

Use the same seven steps in every client meeting.

  1. The brief. Say it back in the client's own words, with how they will judge success.
  2. The limits. Show the room, the rules, the budget and the dates.
  3. The guest's path. Walk the plan from arrival to exit.
  4. The views. Use renders and a walkthrough video for the mood and the order of things.
  5. The key details. Show the stage, the lighting and the materials that carry the idea.
  6. Cost and timeline.
  7. The decisions you need today.

Limits come before pictures for a reason. Say the client has agreed that the room seats 400 at tables. They have also agreed that the exit routes stay clear. Now a request to "just add 60 seats" is a question about those limits. It is no longer a question about your taste.

Which view answers which question?

Each view answers one question. Show it to the people who ask that question. Keep the rest for the right meeting.

ViewAnswersShow to
Plan drawn to scaleDoes it fit, flow and hold everyone?Everyone, and the venue and safety officer in detail
3D renderWhat will it feel like?Client, sponsor, boss
Walkthrough videoWhat do guests see, and in what order?Client, boss, marketing
Elevation, a drawing of one sideHow high, and in what material?Builder, venue, production
Production drawingsWhat is built, and where?Builder, venue, production

Do not show every drawing to every person. A decision meeting turns into a review of details. Nobody in the room can sign those off.

Make sure the views agree. A render with a different stage from the plan starts an argument you do not need. Renders show the feel of the room. For the view from one seat, use a section drawing or a site visit. A section drawing is a slice through the room, seen from the side.

Say why, not what

"The bar moves to the north wall" says what. "The bar sits on the north wall, so its queue never crosses the path to the stage" says why. Then add that the brief asks you to keep that path clear.

Tie each choice to a line of the brief. Say what it costs, too. For example, "This gives you 40 more seats, and you lose the lounge." Avoid "I like" and "we felt". Those words turn a decision into a contest of taste. In that contest, the client has the final vote.

The designer Paul Rand showed his 1986 logo for NeXT as a booklet. It argued, step by step, for one solution. Steve Jobs later recalled asking Rand for a few options. Rand said he would solve the problem, and Jobs could use the answer or not. So show options early, while the brief is still open. Once it is settled, show one design. Late options hand the design work back to the client.

AvoidSay instead
I like this layout.This layout keeps the stage path clear, as the brief asks.
We felt the stage should go here.The stage is on this wall because it has power and a clear view from every table.
What do you think?Does this meet the goal we agreed?
We can do whatever you want.Here is what that change moves.
It's just a first draft.This is what we recommend.

What if the client asks for a change in the room?

Keep problems and fixes apart. Say the client asks you to move the stage to the long wall. Ask what problem that would solve. Then say it back. "So the worry is that the back tables can't see." Answer that problem. It may have a better fix than the one on the table.

Meet the late "small change" by showing what it does, right there. Show what moves, what breaks and which checks fail. A stage pushed three meters forward can put tables across an exit route. The client sees the cost of the change. You do not have to argue it.

Approval often breaks down between the people who make and the people who decide. The Architecture of Approval explains why.

End with a written list of decisions

End by reading out a numbered list of what you agreed. Get a yes to each one before anyone leaves. Send the written record within the hour. Say what the next round will cover, and when.

Written decisions cut the number of rounds. If someone later changes an agreed point, it becomes a new request. It gets its own scope, meaning what the work covers, and its own price. That protects your fee, most of all if you no longer charge by the hour. Copy this record. Here it is filled in for a made up meeting, the one with the late boss.

FieldEntry
Project, date, meetingPartner dinner for 400, 14 March, second design round
Who came (name, role)Ana, client lead. Tom, her boss. You, the designer.
Decisions agreed1. The stage stays on the short wall. 2. The room seats 400 at tables. 3. The exit routes stay clear.
Changes asked for, in the client's words"Can we add a photo wall by the entrance?"
Open questions (owner, due date)Size of the photo wall (Ana, 18 March)
Next round (what it covers, date)The photo wall and the lighting, 21 March
Sent by, and whenYou, 40 minutes after the meeting

Plan the yes

Go back to the boss who walked in late. This time, you called the client the day before. You learned he would come, and what he would ask. So you start with the brief, in his words. You show the limits before the pictures. When he asks for the long wall, you show what moves. He sees the tables land across an exit route. He agrees to the plan as it is. You leave with every decision in writing.

A yes in one meeting is planned. It is not luck.

Frequently asked questions

Should you send an event design to the client before the meeting?

Send the agenda, the brief and the list of decisions you need. Do not send the design itself. A layout read cold, with no reasons, gets comments on taste. If the person who decides cannot come, walk them through it by phone first. Then send the files with a short note on each choice.

How many design options should you show a client?

Show one design once the brief is settled. Options help early, while the brief is still open, and two or three are enough. Late options ask the client to do the design work. They also invite a request to blend them all into one.

What should an event design presentation include?

Start with the brief and how the client will judge success. Then show the limits and the guest's path on a plan drawn to scale. Add renders or a walkthrough, the key details, and the cost and timeline. End with the decisions you need. Keep production drawings for a separate meeting with the builder and the venue.

How do you handle a client who asks for changes in the meeting?

Ask what problem the change would solve, say it back and answer that problem. If the change is small, show its effect on the plan right there, with what moves and which rules it breaks. Write it down as a request with a scope and a date. Do not agree to it on the spot.

Monet makes the plan, the 3D renders and the walkthrough video from one model, so your views always agree. One change updates all of them, and the layout checks run again. Your client sees what a late change costs before saying yes. Get started for free on Monet.

:: Share