How to Price Event Design Work

Ask ten event designers what to charge and you may hear ten numbers. This guide shows how to work out the lowest day rate you can accept. Then you build packages from what you deliver and price large events by their value. Worked examples for a gala, an expo and a product launch show each method in round numbers.
Say a new client calls. They like your work. Then they ask for your day rate. You say the first number that comes to mind. A month later, you find it barely covers your costs.
Here is how much to charge for event design. Start with a floor, not a guess. Work out the lowest day rate you can accept. Base it on your income, your costs and the days you can really bill. Sell packages built on what you deliver. For large events, price against what the event is worth, as three options. Every figure below is made up, in round numbers, to show the method.
Why pricing feels so hard
Pricing is hard at every stage. A graduate with years of event work may still have no rate. An event manager may have to price one long shift, such as New Year's Eve. A new studio has to price private and company work side by side. Many designers also plan and produce, which mixes three jobs into one fee.
Three mistakes sit behind most of these questions. The first is copying someone else's rate. Their rate carries their costs, not yours. The second is pricing time instead of results. The third is quoting one number with no options.
Find your floor
The floor is the lowest day rate you can accept. To find it, add your target income to your costs. Then divide by the days you can really bill.
Floor day rate = (target income + costs) ÷ days you can bill
| Line, made up | Amount |
|---|---|
| Target income | $70,000 |
| Costs for software, insurance, kit, travel and accounting | $15,000 |
| Total to recover | $85,000 |
| Weekdays in a year | 260 |
| Leave and public holidays | 30 days |
| Admin, sales and unpaid time | 90 days |
| Days you can bill | 140 |
| Floor day rate, $85,000 ÷ 140 | about $610 |
In this example, only 140 of 260 weekdays earn money. The floor is the least you can accept. It is not the price you should quote.
Day rates and when they fit
Day rates suit work on site, crew roles and open advice. There, the scope is the time itself. Set four rules. Ask for a minimum booking, such as one full day. Set the half day rate above half the day rate. Decide if travel days are charged or capped. Charge overtime after a set number of hours.
Quote no market rates you cannot source. For design pricing, the standard guide is the Graphic Artists Guild's Handbook, Pricing and Ethical Guidelines.
Event design packages built on what you deliver
A package is a list of work at a fixed price. The client buys a result. You keep any time you save.
What you can put in a package
| What you deliver | Essential | Standard | Full |
|---|---|---|---|
| Brief and site review | Yes | Yes | Yes |
| Layout to scale | Yes | Yes | Yes |
| Rounds of changes | 1 | 2 | 3 |
| 3D renders | 2 | 4 | 8 |
| Walkthrough video | No | Yes | Yes |
| Production drawings, plans and elevations | No | Yes | Yes |
| Site visits | No | 1 | 2 |
| Working with suppliers | No | No | Yes |
| On site supervision | No | No | Yes |
Package prices, made up
| Package | Gala for 400 guests | Expo with 60 stands |
|---|---|---|
| Essential | $3,500 | $5,000 |
| Standard | $7,000 | $10,000 |
| Full | $12,000 | $18,000 |
The floor sets the bottom tier. Say Essential takes five days. Five days at $610 is $3,050, so $3,500 leaves a margin. Never price a tier below its days times the floor.
Value pricing for large work
For large events, ask what the event is worth before you price. Think of sponsors, stand sales, sales leads or launch reach. Ask what failure would cost. Blair Enns makes the case for pricing that value in Pricing Creativity (2018). Jonathan Stark advises three options at different levels of ambition.
Take a made up product launch. The client expects it to support $2 million in sales leads. Here are three options set against that value. The first is $15,000 for the room and the reveal. The second is $25,000. It adds renders and a walkthrough for the sales team. The third is $40,000. It adds you on site to direct. Each is a small share of the value at stake.
Some production managers charge a share of the budget. That model has a flaw. The fee rises as the client spends more. So it rewards a bigger budget, not a better event.
All three examples, priced three ways (made up)
| Example | By day | By package | By value |
|---|---|---|---|
| Gala for 400 guests | 6 days × $610 = $3,660 | Standard, $7,000 | $7,000 / $11,000 / $15,000 |
| Expo with 60 stands | 10 days × $610 = $6,100 | Standard, $10,000 | $10,000 / $16,000 / $24,000 |
| Product launch | 12 days × $610 = $7,320 | Full, $12,000 | $15,000 / $25,000 / $40,000 |
Changes, extra rounds and payment terms
A round of changes refines the agreed design. A change alters the brief, such as the head count, format, venue or date. Price every change order before the work starts.
A change order form records five things. It notes the change, in the client's words, and what caused it. It lists the work affected. It adds the fee and the time. It ends with the client's approval and the date.
Stage your payments. Take a deposit when the client signs, before work starts. Take a payment at concept sign off and another at final layout. Bill the rest when the drawings go out. Put cancellation terms in the contract too. Work done is billed. The deposit covers the time already held for the client.
How to answer the hourly rate question
Steer to the package and the result.
| The client asks | You say |
|---|---|
| What is your hourly rate? | I price by what I deliver, so you know the full cost before we start. For this event, that is the Standard package. |
| Our system needs hours. | I can show the package as capped days, billed at set stages. |
| What if it takes you less time? | The fee covers the approved layout and drawings, however long they take me. |
For examples from other trades, point to companies that bill by the project.
What tools do to your prices
Faster tools make the work shorter. If you sell packages, keep the price and let the margin grow. If you sell days, your income falls. That is the case for ending billable hours. Put software costs in the costs line of your floor.
Go back to that first call. Next time, you know your floor before the phone rings. You answer with a package, not a guess.
Frequently asked questions
Should event designers charge hourly or by project?
Charge by project wherever you can list what you deliver. The client knows the cost up front, and faster work becomes your margin. Keep day or hourly rates for time on site and open advice. Cap them, so neither side is surprised by the final bill.
How much deposit should an event designer take?
Take enough to cover the work done before the first stage payment, and take it before work starts. Tie the rest to concept sign off, final layout and the drawings going out. That way payment tracks progress, and no stage is done unpaid.
Should I publish my event design prices?
Publishing starting prices for packages can filter out clients who cannot afford you before the first call. Keep value priced work off the page. Its fee depends on what each event is worth to that client, so no single number fits.
How do I price my first event design job?
Work out your floor day rate first and count the days honestly. Then quote a package at or above the days times the floor. Write what you deliver and the rounds of changes into the quote. That way the first client learns how you work, not just what you cost.
Monet makes the layout, moodboards, renders and production ready drawings from a venue plan and a brief. One change updates all of them. If you sell packages, that saved time becomes your margin, not a smaller bill. Get started for free on Monet.