When a Quote Is Too Low
A production quote far below the others is a saving only if it buys the same show. This guide shows you how to find where the gap went. You measure the gap, then explain it with house fees, crew days, spares, insurance and crew pay. You test one failure on paper. Whatever is left at the end is the real saving.
Three AV quotes land on Monday morning. Two sit within $1,000 of each other. The third is $18,500 lower. Your client sees it and says, "Take that one." Before you answer, measure the gap.
To compare AV quotes fairly, treat the gap as something to explain, not a saving. AV means the sound, screens and lights. A low number is a saving only if it buys the same show. So this guide does not ask if the low bid is good. It asks where the $18,500 went.
Start with the size of the gap
Take the middle quote, not the highest. Subtract the low quote from it. That number is the gap you have to explain.
Write the gap at the top of a page. Each finding below explains part of it. A house fee left out might explain $6,000. A missing technician might explain $3,000. Keep going until the gap is used up, or until you run out of findings.
What is left at the end is the real saving. Sometimes it is most of the gap, because the supplier owns the kit, is local or has a quiet week to fill. Sometimes it is close to zero.
Public buyers work this way too. In the EU, a public buyer who gets a price that looks far too low must ask the bidder to explain it. The buyer may turn it down only if the answer does not hold up (Directive 2014/24/EU, Article 69). You are not bound by that law. But the habit is a good one. Ask first, then decide.
If your problem is a quote that is too high, read cutting a high AV quote.
Where the missing money goes
Five lines explain most gaps. Check them in this order, because the first ones are the easiest to prove.
| Where | What the low quote may do | What it costs you later |
|---|---|---|
| House fees | Leaves out rigging, power and liaison | The venue bills you directly |
| Labor | Fewer crew, no technician on show days | A slow load in, and nobody to fix a fault |
| Spares | No backup microphones, cables or laptop | One failure stops a session |
| Insurance | No liability cover, or an old certificate | The venue refuses entry, or you carry the risk |
| Crew pay | Rates below a living wage, long shifts | Tired crew, mistakes and crew who do not show up |
None of these lines shows up as a minus sign. They show up as lines that are not there.
House fees the bid left out
Many venues have an AV partner who works in the building every day. When an outside firm comes in, that partner often bills for rigging, liaison and power. Rigging is hanging gear from the ceiling. Liaison is a house technician who stays with the outside crew. Those fees land on your bill, not on the outside quote.
This is the easiest part of the gap to prove. Ask the venue for its rate card. Add its house fees to every bid that left them out. Some venues also charge just for bringing in an outside firm. The outside supplier fee explains that one.
Count crew days, not crew
Labor shrinks most easily on paper. So turn each quote into crew days. Multiply each person by the days they are on site, from load in to strike. The strike is taking it all down after the show.
Here is a made up example. Bid A sends six people for four days. That is 24 crew days. Bid C sends four people for the same four days. That is 16. Eight crew days are gone. Ask Bid C which jobs they were. If nobody can name them, nobody will do them.
Run one failure on paper
Spares and a show day technician are hard to see on a quote. So test them with one failure. Pick a real moment from your run of show. Say the keynote's microphone dies at five past nine, in front of 600 people.
Ask each bidder to walk you through the next five minutes. Who notices first? Where is the spare microphone? Who carries it to the stage, and how long does that take? A strong answer names a person, a place and a time. A weak answer says "we will handle it."
The bidder whose crew leaves after setup cannot answer. The bidder with no spares cannot answer either. Now part of the gap has a cost you can picture.
Who carries the risk
Ask each bidder for a certificate of insurance before you sign. Many venues want one, and some want to be named on it. A bid without it may never get past the loading door.
Read the overtime line next. Say your show days run ten hours. A bid with overtime after eight hours adds two paid hours per person per day. A cheap rate plus overtime can cost more than a fair rate with none.
Then ask what each crew member earns per day. A supplier that wins by paying crew too little is more likely to run tired shows. Tired crew make mistakes and take the next better job. On the day, that risk sits with you, not the supplier.
Compare AV quotes on the same basis
Now put every line on one sheet. Where a bid leaves a line out, add your own estimate and mark it as yours. Compare only the last row.
Here is the sheet filled in for the three made up quotes. Bid C came in $18,500 below Bid A, the middle quote.
| Line | Bid A | Bid B | Bid C | Notes |
|---|---|---|---|---|
| Kit list, same items and models | $24,000 | $25,000 | $21,000 | Same list from all three |
| Crew by role and day, from load in to strike | $12,000 | $12,500 | $5,500 | C sends two fewer crew each day |
| Technician on every show day | In the crew line | In the crew line | $3,000, our estimate | C leaves after setup |
| Spares on site | Included | Included | $1,000, our estimate | C brings no spare microphones |
| Freight and trucks | $3,000 | $2,500 | $2,000 | C is local |
| House fees for rigging, power and liaison | $6,000 | $6,000 | $6,000, our estimate | C left them out, so we used the venue rate card |
| Insurance certificate | Sent | Sent | Not sent yet | Ask C before you sign |
| Overtime rules and rates | After 10 hours, none expected | After 10 hours, none expected | After 8 hours, $3,000 our estimate | Our show days run 10 hours |
| Crew travel, meals and parking | $2,000 | $2,000 | $1,500, our estimate | C did not price it |
| Cancellation terms | Full refund up to 60 days out | Half back up to 30 days out | No refund once signed | C puts the most risk on you |
| Total on the same basis | $47,000 | $48,000 | $43,000 | C is still lowest, but by $4,000, not $18,500 |
Questions to send every bidder
Send these in writing to every bidder, not only the cheapest. Then the answers line up.
- Which lines on our sheet does your quote leave out?
- How many crew days do you price, by role, from load in to strike?
- The keynote microphone dies at five past nine. Walk us through the next five minutes.
- Have you worked in this venue, and did you price its house fees?
- When does overtime start, and at what rate?
- What does each crew member earn per day?
When the low quote is real
Go back to Monday and the $18,500 gap. On the sheet, $14,500 of it was lines that were missing. The real saving is $4,000. That may still be worth taking, if Bid C puts the missing lines in writing. Show your client the last row, not the first number. Then the choice is theirs, and it is a fair one.
Frequently asked questions
How do I compare AV quotes?
Put every quote on one sheet, line by line. Match the kit, crew days, spares, freight, house fees, insurance and overtime. Where a bid leaves a line out, add your own estimate and mark it as yours. Then compare only the totals on that same basis.
Why is one AV quote much cheaper than the others?
Measure the gap against the middle quote, then explain it line by line. Missing house fees, fewer crew days, no spares and early overtime explain most gaps. Whatever is left may be real, because the supplier owns the kit or is local. Ask the low bidder in writing.
What are house fees in an AV quote?
They are charges from the venue or its own AV partner when an outside firm works there. They often cover rigging points, power and a house technician who stays with your crew. Ask the venue for its rate card, and add the fees to every bid that left them out.